Getting around
Road closures in Duluth, 2026
Where official closure news comes from, the highways through Duluth, construction season and how to report a pothole.
Updated November 2026 · official sources and 9 highways
Check current closures near Duluth
Minnesota 511 lists current closures, lane restrictions, incidents and construction on state roads, updated by the state.
Where Duluth road closure information comes from
Minnesota 511
The state's traveler information service: closures, lane restrictions, incidents, construction and, where available, cameras and winter road conditions.
Minnesota Department of Transportation (MnDOT)
Plans and builds the Interstates, US highways and state routes through Duluth, including I-35, I-535 and US 53, and posts project and long-term closure notices.
City of Duluth
Local street closures for public works projects, utility work, parades and special events are posted here, usually under public works or engineering news.
Highways through Duluth
Interstates, US highways and state routes inside Duluth city limits, longest stretch first. Most planned closures on these roads are overnight lane closures.
- I-35Interstate
- I-535Interstate
- US 53US highway
- US 2US highway
- State Highway 61State route
- State Highway 23State route
- State Highway 194State route
- State Highway 210State route
- State Highway 39State route
Minnesota Department of Transportation (MnDOT) maintains these roads; most other streets in Duluth are maintained by the City of Duluth. Closure notices for a highway come from the state, even where it runs through the city.
How to report a pothole or road problem in Duluth
Report a Problem
Potholes, broken signals, faded striping and debris on local streets go to the City of Duluth through this page.
Minnesota Department of Transportation (MnDOT)
Problems on I-35, I-535, US 53 and other state highways go to the state, not the city.
Call 911
For a crash, a downed power line or a hazard in a travel lane that is dangerous right now, call 911 rather than filing a report online.
Road construction season in Duluth: May through October
Normal daily highs in Duluth reach 50°F or more from May through October, the window when paving and most road projects are scheduled. Freeze-thaw months (November through April) open new potholes, so patching peaks in late winter and early spring.
| Month | Normal high | Normal low | Paving weather |
|---|---|---|---|
| January | 20°F | 2°F | Limited |
| February | 25°F | 6°F | Limited |
| March | 36°F | 18°F | Limited · freeze-thaw |
| April | 49°F | 30°F | Limited · freeze-thaw |
| May | 63°F | 41°F | Yes |
| June | 72°F | 50°F | Yes |
| July | 78°F | 56°F | Yes |
| August | 76°F | 55°F | Yes |
| September | 67°F | 47°F | Yes |
| October | 53°F | 36°F | Yes |
| November | 37°F | 23°F | Limited · freeze-thaw |
| December | 25°F | 10°F | Limited |
How this page is made
Highways are the Interstates, US highways and state routes inside Duluth city limits (Census boundary) in U.S. Census Bureau TIGER/Line 2024 road data, checked against current route designations (a retired number is shown as the route that replaced it, or left out) (source), longest stretch first.
Construction season uses NOAA 1991–2020 monthly normals from the Duluth, MN station: months whose normal daily high is 50°F or more, the usual minimum for paving.
Official sources are the state road service the Duluth getting-around page links, and the "Report a Problem" link found on the local government's official homepage (duluthmn.gov). Checked 2026-11-17.
Road closures in Duluth: answers
Where can I check road closures in Duluth?
For every state road, use Minnesota 511 (511mn.org). Local street work is posted by the City of Duluth (duluthmn.gov).
Which highways run through Duluth?
I-35, I-535, US 53, US 2, State Highway 61, State Highway 23, State Highway 194 and State Highway 210 pass through Duluth city limits, based on Census road data. Minnesota Department of Transportation (MnDOT) maintains Interstates, US highways and state routes, and local streets are maintained by the City of Duluth.
How do I report a pothole in Duluth?
On a local street, report it to the City of Duluth through its “Report a Problem”. On I-35, I-535, US 53 or another state highway, report it to Minnesota Department of Transportation (MnDOT). For a hazard that is dangerous right now, call 911.
When is road construction season in Duluth?
Mostly May through October, when normal daily highs in Duluth reach 50°F or more (NOAA 1991–2020 normals). Paving needs mild, dry weather, so work outside those months is usually limited to repairs.
When is pothole season in Duluth?
Late winter and early spring. Duluth averages 3 months with lows at or below freezing and highs above it (November through April); water that freezes and thaws in cracks is what opens most potholes.